// Specialized Procurement · North America

Power & Compute Supply Chain, Unlocked.

Powering Next-Generation Compute.

Direct global procurement for high-density AI infrastructure. Bypassing multi-year lead times to supply gas turbines, utility-scale transformers, battery storage (BESS), and liquid-cooled AI compute clusters across North America.

Book a Call

01

Turbine Power Supply Chain

Specialized sourcing for aeroderivative & industrial gas turbines for rapid on-site generation.

02

AI Compute & Server Systems

Direct access to rack-scale liquid-cooled AI infrastructure (including NVIDIA GB300 NVL72 / GB200 architectures).

03

Grid & Storage Hardware

High-voltage transformers, switchgear, and utility-scale Battery Energy Storage Systems (BESS).

04

Global Logistics & Delivery

Fully managed international supply chain, customs compliance, and direct-to-site delivery.

The Bottleneck

Solve the AI Power & Hardware Sourcing Bottleneck

Deploying high-density data centers requires navigating 2-to-4-year lead times on critical power electronics and compute hardware. Vertica Global operates as a dedicated procurement and supply chain partner, linking hyperscalers, data center developers, and enterprise operators directly to global equipment allocations.

Data Center Operator / Hyperscaler
Vertica Global Procurement Engine

1. Power Generation

Gas & Aero Turbines

2. Grid & Energy

BESS & Transformers

3. AI Compute

Rack-Scale Liquid · GB300 / GB200 Pods

01

Turbine & On-Site Power Sourcing

Securing primary and bridge power generation equipment to bring sites online ahead of utility grid interconnections.

02

Transformers & BESS Storage

Sourcing long-lead electrical infrastructure, including high-voltage transformers, switchgear, and containerized battery enclosures.

03

Advanced AI Compute Clusters

Delivering complete rack-scale hardware—from L10 compute trays to fully integrated L11 liquid-cooled rack configurations.

Core Supply Chain Offerings

01

Specialized Turbine & Power Sourcing

Aeroderivative & Industrial Gas Turbines

Procuring on-site generation units for bridge power, microgrids, and continuous off-grid operations.

Rapid Deployment Power Modules

Mobile and containerized power units engineered for rapid site installation.

Co-Gen & Thermal Systems

Heat recovery and auxiliary power systems designed for continuous high-load operations.

02

High-Density AI Compute & Server Procurement

Rack-Scale AI Solutions

Direct procurement of next-generation AI architectures, including NVIDIA GB300 NVL72 rack-scale solutions (36 CPUs / 72 GPUs per rack with 5th Gen NVLink interconnectivity).

L10 & L11 System Integration

Sourcing complete L10 compute trays (Grace CPUs, Blackwell/GB300 GPUs) through to full L11 rack assemblies.

Liquid-Cooling Infrastructure

In-row and sidecar Coolant Distribution Units (CDUs)—supporting both Liquid-to-Air and Liquid-to-Liquid cooling capacities up to 1350 kW.

03

Transformers, BESS & Grid Electronics

Utility-Scale Transformers

Securing high-voltage step-up and step-down power transformers to eliminate grid connection delays.

Battery Energy Storage Systems (BESS)

Utility-scale battery storage for peak shaving, frequency regulation, and power smoothing.

Switchgear & Power Shelves

High-capacity busbars, power distribution boards (PDB), and management interposers for high-KW rack densities.

Hardware Specification Highlight

Featured Architecture: GB300 NVL72 Rack-Scale System Specs

Rack Configuration (L11)
Single MGX 48RU Rack integrating 36 CPUs & 72 GPUs
Compute Tray Architecture (L10)
1RU Form Factor containing 2x NVIDIA 72-core Grace Arm CPUs & 4x NVIDIA GPUs
Interconnect Speed
NVLink 5th Generation delivering up to 1,800 GB/s bi-directional bandwidth
Networking Fabric
InfiniBand XDR (800GbE Ethernet) & 2 x 400GbE Compute Fabric
Thermal Management
Integrated Liquid-to-Air and Liquid-to-Liquid CDU solutions (Up to 1350 kW capacity)

Comparative Advantage

Why Vertica Global

Sourcing CapabilityTraditional Equipment BrokersStandard IT DistributorsVertica Global Procurement
Turbine & Heavy Power SupplyNo access to heavy power equipmentNot offeredDirect turbine & generator manufacturer access
Transformer & BESS Lead Times120+ week standard factory queuesNo high-voltage power capabilitiesAccelerated global supply chain allocations
Rack-Scale AI HardwareLimited to standalone GPU cardsStandard server queue allocationTurnkey L10/L11 rack-scale pods & liquid cooling
Logistics & DeliveryFOB Factory (Customer handles freight)Local ground shipping onlyEnd-to-end global freight, customs, & site delivery

Call to Action

Secure Your Power & Hardware Allocations

Skip multi-year lead times. Contact our Toronto procurement team to review available equipment inventories, request technical spec sheets, or discuss custom supply chain allocations for your site.

Headquarters
Toronto, ON, Canada
Global Procurement Network
North America (Canada & USA) | Europe | Asia-Pacific
Book a Call
Equipment Required